Cost overruns in Swedish transport projects

Download
Mattias Lundberg
Anchalee Jenpanitsub

Cost overrun of transport projects is one of the most important problems in transport planning. It also makes the result of the cost-benefit analyses uncertain, thus decreasing their usefulness for decision making. In recent years more emphasis has been put on improving cost calculations and reducing cost overruns, in Sweden and internationally. Still cost overruns have not decreased. We find that the average cost overrun in Swedish road projects is similar to other countries, while it is lower than in other countries for rail. Small projects (< 100 million SEK) have much higher cost overruns than large projects and constitute a large share of total overruns. A project type with large overruns, both in absolute and relative terms, is new rail tracks on existing lines. To improve cost estimates in Sweden, the Successive Calculation method has recently been applied. We find that the variance is significantly lower in these than in actual outcomes, and that the difference is surprisingly small between projects in different planning stages. Another method, Reference Class Forecasting, is demonstrated in two case studies. It results in higher required uplifts. An interesting way forward would be to develop risk-based estimating, based on principal component analysis. To do that, a database needs to be collected, which in turn demands better follow-up procedures.

MEET US


7
Dec

Shipping and the environment – research meets reality

Centre for Transport Studies (CTS) in co-operation with Ports of Stockholm invite you to the seminar Shipping and the environment – research meets reality.

LATEST NEWS


2017-10-16

ERPUG Forum

The five-year anniversary of European Road Profile Users' Group (ERPUG) Forum will take place at Ramboll head quarter, Copenhagen, Denmark October 19-20, 2017.


2017-09-29

Self-driving buses in Sweden next year?

A self-driving, fossil-free bus. This idea might become reality through a forthcoming collaborative project involving the Swedish National Road and Transport Research Institute (VTI), Linköping University and several other participants. The project group aim...


2017-09-29

New climate-proof solutions for hard surfaces in cities

High-density road infrastructure that emphasise maximum durability and minimum maintenance create inflexible systems, which put increased stress on urban trees and lead to increased risk for flooding. Over the past five years, the ‘Climate-proof solutions for...


2017-09-29

VTI is preparing for automated vehicles

Automation of traffic systems will lead to major changes. The European Union’s (EU) CoEXist research project began in June 2017 with the aim of preparing cities and road operators for the introduction of self-driving vehicles. The Swedish National Road and...


2017-07-05

Vehicle Driver Monitoring: sleepiness and cognitive load

To prevent road crashes it is important to understand driver related contributing factors, which have been suggested to be the critical reason in 94 per cent of crashes. The overall aim of the project Vehicle Driver Monitoring has been to advance the...


2017-06-29

Tomas Svensson new director-general

Tomas Svensson was today appointed Director-General of VTI. Tomas has been acting Director-General since January 2017.